+86-551-68661901
Glass Encapsulated Ntc Thermistor Sensor with Long Lead Wire

Glass Encapsulated Ntc Thermistor Sensor with Long Lead Wire

glass encapsulation
high temperature resistant
Operating temperature range: -40℃~250℃

Description

We thinks what customers think, the urgency of urgency to act during the interests of a purchaser position of theory, allowing for much better good quality, lower processing costs, prices are extra reasonable, won the new and old buyers the support and affirmation for Online Exporter for Glass Bead NTC Thermistor, Diode Temperature Sensor, Surface Mounting Temperature Sensor. Based on the absorption of science and technology, the introduction of advanced technology at home and abroad, the company continues to develop new products, we continue to interact with customers, track equipment operating conditions, improve after-sales service work, and won unanimous praise from customers. Over the years, the company has been continuously developing new technologies and new products, improving the scientific and technological content of products to meet the market demand.

Brief Instruction:

Diode Temperature Sensor, as one NTC thermistor sensor, glass coating NTC thermistor is made of glass bead, thinner dumet wire. 


Features:

● The assembly method is simple and firm.

● The resistance value and B value can be made according to customer needs.

● Hardware and wires can be customized.



Application:

home appliance

automotive electronic


Part Number Code:

31

For example: B8103F3435BF: MF58 series NTC thermistor, R25℃=10kΩ±1%, B25/85=3435k±1%;


Structure and Dimensions:

30


The diode temperature sensor is encapsulated in glass, which can be used under harsh conditions such as high temperature and high humidity. It has good stability, high reliability, small size, solid structure, and easy automatic installation.


Product picture/images

32

Standard packing (inner packing): 500pcs/polybag


About us:

With years of independent R&D team and advanced experimental equipment, Jingpu Sensor has developed into a large-scale enterprise. The company designs, manufactures and sells a full range of thermistors and temperature sensors, from consumer electronics, medical to automotive, we use smarter, faster and better technology and services to endow high-quality products.


2


After years of hard work, our Glass Encapsulated Ntc Thermistor Sensor with Long Lead Wire has been recognized in the global market, and is favored by more and more customers for its stable product quality and reasonable prices. We have always put quality and service first, and will continue to strive to provide the highest quality products and services to each customer. Since the establishment of our company, we have been cooperating with colleagues from all walks of life with the most sincere heart, absorbing the essence and eliminating the dross in the cooperation, in order to maximize the development.

Hot Tags: diode temperature sensor, China, suppliers, manufacturers, factory, customized, wholesale, price, cheap, Russian, free sample, made in China, personalized temperature sensor, reusable medical temperature sensor, military medicine temperature sensor, ntc thermistor for power module assembly, thermal element, standalone custom temperature sensor